DK-Lok industrial pipes and gauges.

Search Catalog

Unit of Measure

Specifications

Z Series Ferrule

N/A Yes

Material

N/A Titanium Gr. 2

Moly Coating

N/A None

Dimensions

D - Tube O.D.

N/A 5/8 in

Operation Instructions

N/A

    1. Insert tubing into DTM until it is bottomed on tool.
    2. Mark the tube at the top of the DTM with a pen.
    3. Remove the tube from the DTM and insert into fitting until it is bottomed on the shoulder of the fitting body.
    4. If the marking can be seen above the fitting nut, it indicates the tube not fully bottomed inside the fitting.